Device

Lisburn Primary & Community Care Centre

OHMG Lisburn Primary & Community Care Centre exterior
Access controlled timber corridor door with magnetic locking_integrated hardware_contactless access for hygiene control_stainless steel hardware_healthcare_education_commercial
Glazed screens_internal timber screens_healthcare building_ Lisburn Primary & Community Care Centre
Automated timber doors_corridor doors_healthcare_education_office door with glazed panel_access controlled
Automated timber doors_corridor doors_healthcare_education_office door with glazed panel_access controlled_ironmongery
Automatic timber door with access control_vision panel_corridor door_restricted access door
Concealed timber riser doors_Handrails_glazed screens_healthcare building (2)
Contactless access_sensor operation_hygiene control_Corridor door_timber door with integrated ironmongery hardware
Corridor door_leaf and a half_integrated door frame_healthcare building_consultation room_office
Glazed double timber doors_Corridor doors with surrounding glazed screens_Adjacent glazed screens_Vision panels
Non fire rated timber door_Elite Doors_ironmongery_hinges
Specialist timber doors_mental health facility_full mortise hinge_automatic double timber door with access control_Corridor door
Timber corridor door with integrated hardware_Glazed panels_vision panels
Timber door_Corridor door_patient room door_consultation room_integrated hardware_frame
Timber door_leaf and a half_corridor door_consultation room_office door_healthcare_education_commercial
Timber fire door with magnetic locking_access control_corridor door_healthcare_Education_leisure_office_vision panels_solid overhead panel
Timber office door_access control_magnetic locking_adjacent timber framed screen
Timber riser doors_fire rated riser doors_corridor doors_healthcare_education_handrail

High Performance Doorsets Supplied and Installed in State-of-The-Art Healthcare Facility

  • Sector Healthcare
  • Location: Lisburn
  • Architect: Scott Tallon Walker
  • Contractor: O'Hare & Mcgovern

Project Overview

Located just next to the listed maternity building within the Lagan Valley Hospital complex, the Lisburn Primary & Community Care Centre is a state-of-the-art healthcare facility, comprising a 4-storey building which accommodates 6 GP practices, diagnostic imaging, physiotherapy, adult and children’s mental health services, pharmacy, allied health services and administration for outreach services.

We worked closely with our parent company KCC Group and the main design team in O’Hare McGovern from initial design and specification stage leveraging KCC’s 360 strategy approach in order to create a high-performance timber doorset with integrated access control and ironmongery solution for a healthcare project of this magnitude. We were in constant communication with the design and site teams to orchestrate a phased delivery and installation program in 2021. We delivered a full suite of fully certified timber doorsets for the entire project, which were manufactured specifically to meet the projects performance criteria and requirements at our manufacturing facility in Mallusk, Antrim. A variety of door styles and finishes were required across the building, giving consideration to the inclusion of vision panels, surrounding screens, fanlights, fire and smoke resistance and acoustic insulation requirements, depending on the intended use and location of each doorset.

We worked closely with our colleagues in KCC Group on the project ironmongery requirements to ensure that all doorsets were pre-prepared for all KCC hardware, ready for on-site installation. KCC’s team of BM Trada joinery experts facilitated the compliant installation of all doors, ensuring a consistent, high standard of quality across the entire project, from manufacturing through to installation and the KCC service division will continue to work with the long-term facility management company to ensure the effectiveness and longevity of these doors going forward. As part of the strategy process early on in the design stage of the project, we looked at the building user requirements in terms of fire safety, security and functionality. Through the collaboration of the teams in Elite Doors and KCC Group and the use of appropriate fire door specification, hardware and automation we successfully designed, supplied and installed a suitable door, access and automation strategy to facilitate the flow of people into and around the building, providing support to the exterior, basement and carpark areas and to ensure that all strategies worked seamlessly together.

Project Features